Architectural Resources

Built to be specified.

Everything architects, interior designers, and development teams need to put FlowStone in the drawing set: performance data, compliance documents, process, and support.

Performance and Compliance

The system, on paper.

We publish the numbers. Every value below names the test that produced it, and the source reports live in the document library on this page.

PropertyResultStandard
Fire RatingClass A: 0 flame spread, 0 smoke developedASTM E84
In plain English: zero and zero are the best values the ASTM E84 tunnel test records. The surface contributed no flame spread and no smoke.
Slip Resistance0.70 dry, 0.65 wetANSI A326.3
Coefficient of Friction0.85, ADA compliantMIL-D-24613
In plain English: the surface keeps its grip in dry and wet conditions and meets the accessibility bar for barrier-free interiors.
Tensile Strength4,100 psiASTM D638
Bond to Concrete2,250 psiASTM C297
Hardness75 Shore DASTM D2240
Impact Resistance160+ in-lbASTM D2794
Abrasion22 mg lossASTM D4060
Water Absorption0.029%ICC-ES AC-39
In plain English: at 0.029 percent absorption, spills sit on the surface and wait for the mop. Tested at Ramtech Laboratories, report 4501-A.
Crack Bridging3/32 inAC308 Appendix A
TVOCUnder 0.04 mg/m3CDPH v1.2
ApplicationSeamless fluid-applied flooring, poured and hand-finished in placeCSI 09 67 00

Need the full reports for permitting or plan review? The System Testing and Compliance Report is in the partner library below, and our team supplies project-specific documentation through spec assistance.

Acoustic Performance

Quiet, by configuration.

Impact sound is a property of the whole floor assembly, so we publish Impact Insulation Class by configuration instead of hiding behind a single number.

Most building codes require a minimum of IIC 50. FlowStone meets code on every configuration tested, on wood-frame and concrete assemblies alike. Where the brief calls for quieter, acoustic mats raise ratings into the luxury tier of IIC 60 to 69 and the ultra tier of IIC 70 and above.

Substrate ConfigurationFlowStone IICWith Insulation
Wood frame + 1/2 in magnesium cement board50-5455-59
Wood frame + 3/4 in magnesium cement board52-5657-61
Wood frame + 3/4 in gypsum concrete (bare)53-5758-62
Wood frame + 3/4 in gypsum concrete + 1/8 in acoustic mat63-6768-72
Wood frame + 3/4 in gypsum concrete + 3/8 in acoustic mat67-7172-76
Wood frame + 1 in gypsum concrete (bare)55-5960-64
Wood frame + 1 in gypsum concrete + 1/8 in acoustic mat65-6970-74
Wood frame + 1 in gypsum concrete + 3/8 in acoustic mat69-7374-78
Bare concrete, 7 to 8 in slab (high rise)50-5554-59

Source: manufacturer configuration data. Ratings are ranges by assembly; the insulation column shows the same assembly with ceiling insulation added. Verify the assembly for your project with our technical team.

Substrates and Limits

Where it belongs. And where it does not.

A system worth specifying tells you its limits before your inspector does.

Approved substrates

  • Prepared concrete, mechanically ground to profile
  • Gypsum concrete with proper surface preparation
  • Wood subfloors with magnesium cement board underlayment

All substrates must be structurally sound, clean, and free of contaminants, with moisture within manufacturer specifications.

Honest limitations

  • Install between 40°F and 100°F, held for 48 hours before, during, and 48 hours after installation
  • Not for exterior use or areas of constant water submersion
  • Minimum concrete age of 28 days, free of curing compounds and sealers

Unsure whether your assembly qualifies? Send the detail through spec assistance and we will tell you straight.

Installation

From slab to showpiece.

The typical timeline for a standard apartment unit of 800 to 1,500 square feet. One step per day.

Surface Preparation and Crust

Day one. The floor is mechanically ground clean with HEPA-filtered equipment, then the proprietary Crust base coat is troweled down in one continuous operation.

Crust Finish and Color

Day two. After overnight cure the base is refined, then the reactive Color coat is applied in fine misted passes until the depth is right. This is the hand-finished pass that makes every floor an original.

Clear and Final Inspection

Day three. The high-performance Clear coat locks in the finish, and the floor is inspected and approved.

Cure times: light foot traffic 24 hours after the final sealer, full occupancy 72 hours after the final sealer. Lower temperatures and higher humidity extend cure times.

Documents and Downloads

Take it into the drawing set.

The overview, the technical data sheet, and the full color chart, ready for your project folder.

Partner Document Library

For specifiers and project partners.

Partner documents are available to our working partners. Enter your access code, or request access through your FlowStone representative.

No access yet? Ask your FlowStone representative.

Spec Assistance

A direct line to the technical team.

The finished space you create should be the pride of your work. The paperwork behind it should be the easy part.

Tell us where the project stands. We return spec language, documentation, and the answers your reviewers will ask for.

  • Three-part CSI specification, Section 09 67 00 Fluid-Applied Flooring
  • Architectural submittal package and SDS documents
  • Published test data with the standard cited on every value
  • Project-specific details straight from the technical department

Fields marked * are required.

We use this information to respond to your inquiry. See our Privacy Policy. We never sell personal information.

For Specifiers

Put it in the project manual.

Three-part CSI specification, submittal package, test reports, and SDS documents. If you need a project-specific detail, our technical team works directly with your office.